

Interior view of the Kennedy Space Center's (KSC) Manned Spacecraft
Operations Building showing Lunar Module 5 being moved from workstand for
mating with its Spacecraft Lunar Module Adapter (SLA). LM-5 is scheduled to
be flown on the Apollo 11 lunar landing mission